
|  | 
  
Interior Demolition, Framing wtih Metal Studs, and Water Taxi Tour - Interior work and demolition are progressing simultaneously in the warehouse rehab project. Bob and Chris Vila review three weeks worth of progress at the location. Work performed to date includes the removal of an old elevator shaft, and glass bead blasting the remaining wood and brick exposed surfaces. A new tongue and groove plywood subfloor is being installed, and basic wall framing has started. Bob takes us on a Water Taxi tour to learn more about the history of heavy industry along Brooklyn's waterfront.
|
|
|